Hired by my buddy Goose to remodel his bathroom. Gutted it all, installed new toilet, tub, shower with new valve and tile walls, floating vanity and matching floating vertical cabinet set, all above new waterproof vinyl plank flooring. Little drywall, paint and trim and it was good to go. Job completed in 13 days. Roseburg, OR; October 2023.